VI / INSTALLATION ARCHITECTURE

Defined signals. Defined boundaries.

A service-first conceptual architecture for supervisory elevator intelligence.

This is a functional overview, not a field wiring drawing. Every installation requires qualified engineering review of interface ratings, approvals, fault effects and the particular elevator controller.

SYSTEM FLOW

From field evidence to technician decisions.

The supervision channel is shown left to right. A separate boundary keeps advisory AI away from motion/safety actuation.

01 / EXISTING ELEVATOR
⌁

Monitored states

Brake feedback, door/lock status, operating feedback

Existing equipment · signal characteristics vary
02 / PROTECTION
◇

Rated interfaces

Conditioning, isolation, protection and defined reference

Application-specific design · not finalized
03 / DETERMINISTIC
▤

VI supervisory PLC

State validation, sequence, time and event capture

Wecon LX3V / LX5S under evaluation
04 / TECHNICIAN VIEW
▣

Industrial HMI

Status, history, alarm context, human requests

Communication configuration to be verified
ADVISORY CHANNEL ONLYVI Assistant / SmartAssist

Explains codes and recorded evidence. Cannot command motion, override interlocks, or declare equipment safe.

CONTROL & SAFETY BOUNDARY

Elevator primary control and safety functions remain separately engineered. Any UCM protective output requires independently validated, approved architecture—not the advisory branch illustrated here.

Important

The diagram intentionally omits terminal numbers, voltage conversion circuits and safety-loop connections. Do not connect 110/220 VAC or 230 VDC field signals directly to a low-voltage PLC or HMI. Protective interfaces must be correctly rated and independently assessed for the actual installation.

INSTALLER CHECKLIST · PLANNING

Decisions that belong in the engineered package.

01

Field signal schedule

Source, voltage type, transient levels, isolation boundary, monitored meaning and permissible loading.

02

Communications & power

RS-485 topology and isolation, Ethernet segregation, surge/grounding strategy and DC supply verification.

03

Commissioning evidence

Approved I/O map, test procedure, expected states, fail-safe review, recorded results and sign-off authority.

HARDWARE DEEP DIVE

See the candidate field platform.

Illustrated components, supplier-discussed specifications and design questions.

Explore the hardware →